High-precision injection moulding solutions with machine capabilities ranging from 150T to 750T across Plant 1 & Plant 2 in Bhosari, Pune.
Manufacturing headlamp housings, tail lamp housings, and reflector assemblies engineered to precise automotive OEM specifications.
Engineered ABS raised pavement markers with 50-ton load resistance, weather resistance, and up to 10-year durability.
Comprehensive secondary operations including ultrasonic welding, hot plate welding, insert moulding, and specialized assembly.
Dedicated Plant 2 in Sector 7 Bhosari featuring heavy tonnage injection moulding machines for large-scale automotive components.
Custom finishing, insert moulding, stringent in-process inspection, packaging, and structured dispatch solutions.
Aditya Enterprises offers end-to-end injection moulding capabilities from 150T to 750T across dual plants in Bhosari MIDC, Pune. Certified under IATF 16949 and ISO 9001, we deliver zero-defect quality and precision engineering.
Call Us Any Time:
+91 98507 76556We operate injection moulding machines ranging from 150T to 750T across our two manufacturing facilities in Bhosari, Pune. Plant 1 (Sector 10) houses 6 machines from 150T to 350T, while Plant 2 (Sector 7) houses heavy tonnage machines from 550T to 750T.
Our road safety reflectors (raised pavement markers) are manufactured using uncoloured ABS (Acrylonitrile Butadiene Styrene) natural plastic, delivering up to 50-ton load resistance, high retro-reflective visibility in low-light conditions, and up to 10 years of weather resistance.
Aditya Enterprises operates under IATF 16949, ISO 9001, and ISO 14001 certified quality management systems, incorporating in-process inspection, traceability systems, customer-specific quality requirements, and a zero-defect manufacturing approach.
Yes, we provide full sub-assembly operations including ultrasonic welding, hot plate welding, insert moulding, secondary precision finishing, packaging, and structured dispatch solutions.
We operate two units in PCNTDA, Bhosari, Pune – 411026: Plant 1 (Main Production Unit) at Plot No. 229, Sector 10, and Plant 2 (Auxiliary Production Unit) at Plot No. 115, Sector 7.